Delhi Solar Subsidy 2026: The Complete ₹78,000 Guide
Delhi solar subsidy 2026 explained: ₹78,000 Delhi subsidy, ₹78,000 PM Surya Ghar and a ₹19,000 top-up. Slab-wise tables, eligibility and how to apply.
Rooftop solar in Delhi attracts two separate subsidies — the central PM Surya Ghar Muft Bijli Yojana and the Delhi Solar Policy subsidy plus Generation Based Incentive. Each has its own portal and its own sequence. Here is the full flow.
| Central — PM Surya Ghar | State — Delhi subsidy + GBI | |
|---|---|---|
| Portal | pmsuryaghar.gov.in | solar.delhi.gov.in |
| Amount on 3 kW | ₹78,000 | ₹78,000 + ₹19,000 top-up* |
| When to apply | Before installation | After the net meter is fitted |
| Payment | DBT to your bank account | DBT to your bank account |
*The ₹19,000 top-up applies only up to 400 units a month. For a 2 kW system it is ₹18,000.
The single biggest mistake: getting panels installed first and applying afterwards. Central registration must happen before installation, or the claim can stall.
Keep these ready and the process moves far faster:
Enter your state (Delhi), discom (BRPL / BYPL / TPDDL) and consumer number, then verify by mobile OTP. Once logged in, complete the rooftop solar application form with your proposed system capacity and details.
Your discom checks whether the proposed capacity is technically feasible on your connection — sanctioned load, transformer capacity and so on. This usually takes 5 to 10 days. Do not start installation before this approval.
After feasibility approval, select your vendor, take a written quotation and issue the work order. The quotation should clearly state the panel brand and model, inverter, structure specification, timeline, warranty and how the subsidy will be handled.
Remember: for the Delhi subsidy and GBI, choosing a PM Surya Ghar empanelled vendor is not mandatory — read the official rule here.
The physical installation usually takes one to three days: mounting structure, modules, inverter, DC/AC cabling, earthing and lightning arrestor. Your vendor then submits the installation details and photographs on the portal.
This is the longest stage. The net meter application goes to the discom, after which an inspector visits the site and checks:
Once it passes, the net meter is installed and a commissioning report is issued — that report is the basis of the subsidy claim. Budget 10 to 20 days for this stage.
After the net meter is fitted and the commissioning report is issued:
The Delhi Solar Portal also has a “Check Capital Subsidy Released Status” option where you can track your application.
| Stage | Time |
|---|---|
| Survey to written quotation | 1–2 days |
| Portal registration + feasibility approval | 5–10 days |
| Installation | 1–3 days |
| Net meter application, inspection, fitting | 10–20 days |
| Subsidy credited (after net meter) | 30–45 days |
Total: roughly 25 to 45 days from the first call to the subsidy landing in your account, assuming documents are complete and the discom inspection is not delayed.
| Your part | SolarfiX's part |
|---|---|
| Provide documents (bill, Aadhaar, PAN, bank details) | PM Surya Ghar registration and application |
| Give roof access for the survey and installation | Rooftop survey, system design and written quotation |
| Approve the quotation | Feasibility follow-up with the discom |
| Have someone at home on inspection day | Installation, earthing and commissioning |
| That's it | Net meter filing, inspection coordination, Delhi Solar Portal subsidy and GBI application, and status tracking |
We handle the whole paperwork trail at no extra charge — because in Delhi, the subsidy process is exactly where most people get stuck.
Delhi solar subsidy 2026 explained: ₹78,000 Delhi subsidy, ₹78,000 PM Surya Ghar and a ₹19,000 top-up. Slab-wise tables, eligibility and how to apply.
Delhi free solar panel scheme 2026: homes using up to 400 units a month get a 3 kW rooftop system fully covered by subsidy. Eligibility, the catch, and how to apply.
The official Delhi Solar Portal rule: choosing a PM Surya Ghar empanelled vendor is not mandatory. Delhi subsidy and GBI apply to all net meter installations.
3 kW solar panel price in Delhi 2026: ₹1.75 lakh listed cost, ₹0 to ₹19,000 after subsidy. Monthly generation, savings by slab and a 25-year calculation.
Keep your electricity bill handy and call us — in five minutes we'll tell you your subsidy, what you'd pay and what you'd save.