Rooftop solar in Delhi attracts two separate subsidies — the central PM Surya Ghar Muft Bijli Yojana and the Delhi Solar Policy subsidy plus Generation Based Incentive. Each has its own portal and its own sequence. Here is the full flow.

1. Two subsidies, two portals

 Central — PM Surya GharState — Delhi subsidy + GBI
Portalpmsuryaghar.gov.insolar.delhi.gov.in
Amount on 3 kW₹78,000₹78,000 + ₹19,000 top-up*
When to applyBefore installationAfter the net meter is fitted
PaymentDBT to your bank accountDBT to your bank account

*The ₹19,000 top-up applies only up to 400 units a month. For a 2 kW system it is ₹18,000.

pmsuryaghar.gov.in
Screenshot of the PM Surya Ghar Muft Bijli Yojana portal registration page where applicants select their state, distribution company and enter their electricity consumer number
Registration on the central portal starts with your state, discom and consumer number. Source: pmsuryaghar.gov.in, Ministry of New and Renewable Energy, Government of India.

The single biggest mistake: getting panels installed first and applying afterwards. Central registration must happen before installation, or the claim can stall.

2. The document checklist

Keep these ready and the process moves far faster:

  • Latest electricity bill (BRPL / BYPL / TPDDL) — for the consumer number and sanctioned load
  • Aadhaar card of the connection holder
  • PAN card
  • Bank passbook or cancelled cheque — for DBT; the name must match the bill
  • Photographs of the roof — two or three angles
  • Proof of property ownership — registry, allotment letter or house tax receipt
  • NOC — for builder floors, joint property or society roofs
  • Aadhaar-linked mobile number for OTP

3. Steps 1–3: registration and approval

Step 1 — Register on the PM Surya Ghar portal

Enter your state (Delhi), discom (BRPL / BYPL / TPDDL) and consumer number, then verify by mobile OTP. Once logged in, complete the rooftop solar application form with your proposed system capacity and details.

Step 2 — Wait for feasibility approval

Your discom checks whether the proposed capacity is technically feasible on your connection — sanctioned load, transformer capacity and so on. This usually takes 5 to 10 days. Do not start installation before this approval.

Step 3 — Finalise the vendor and paperwork

After feasibility approval, select your vendor, take a written quotation and issue the work order. The quotation should clearly state the panel brand and model, inverter, structure specification, timeline, warranty and how the subsidy will be handled.

Remember: for the Delhi subsidy and GBI, choosing a PM Surya Ghar empanelled vendor is not mandatory — read the official rule here.

4. Steps 4–5: installation and net meter

Timeline of the six steps to install rooftop solar in Delhi and receive the subsidy, with typical durations for each step
The net meter and discom inspection is normally the longest stage.

Step 4 — Installation

The physical installation usually takes one to three days: mounting structure, modules, inverter, DC/AC cabling, earthing and lightning arrestor. Your vendor then submits the installation details and photographs on the portal.

Step 5 — Net meter application and inspection

This is the longest stage. The net meter application goes to the discom, after which an inspector visits the site and checks:

  • Installation quality and electrical safety
  • Earthing and protection devices
  • Inverter grid compliance
  • The proposed meter location

Once it passes, the net meter is installed and a commissioning report is issued — that report is the basis of the subsidy claim. Budget 10 to 20 days for this stage.

5. Step 6: the money arrives

After the net meter is fitted and the commissioning report is issued:

  1. Central subsidy — submit your bank details on the PM Surya Ghar portal to file the claim.
  2. Delhi subsidy and GBI — apply through the “Apply for Delhi Solar Subsidy and GBI” section of the Delhi Solar Portal.
  3. After verification, both amounts are transferred by DBT straight to your bank account.

The Delhi Solar Portal also has a “Check Capital Subsidy Released Status” option where you can track your application.

solar.delhi.gov.in › Check Capital Subsidy Released Status
Screenshot of the Delhi Solar Portal page used to check the released status of the capital subsidy for a rooftop solar application
Track the state subsidy release from the portal itself, without chasing anyone. Source: solar.delhi.gov.in, Department of Power, Government of NCT of Delhi.

6. How long each stage takes

StageTime
Survey to written quotation1–2 days
Portal registration + feasibility approval5–10 days
Installation1–3 days
Net meter application, inspection, fitting10–20 days
Subsidy credited (after net meter)30–45 days

Total: roughly 25 to 45 days from the first call to the subsidy landing in your account, assuming documents are complete and the discom inspection is not delayed.

7. Six reasons applications get rejected

  1. Installing before registering — the most common and most expensive mistake.
  2. Name mismatch — if the electricity bill, Aadhaar and bank account names differ, DBT fails.
  3. No net meter — without it there is no Delhi subsidy and no GBI.
  4. Panels or inverter outside approved specifications.
  5. Capacity above the sanctioned load — rejected at feasibility; you need a load enhancement first.
  6. Missing NOC — required for joint property, builder floors and society roofs.

8. What you do, what we do

Your partSolarfiX's part
Provide documents (bill, Aadhaar, PAN, bank details)PM Surya Ghar registration and application
Give roof access for the survey and installationRooftop survey, system design and written quotation
Approve the quotationFeasibility follow-up with the discom
Have someone at home on inspection dayInstallation, earthing and commissioning
That's itNet meter filing, inspection coordination, Delhi Solar Portal subsidy and GBI application, and status tracking

We handle the whole paperwork trail at no extra charge — because in Delhi, the subsidy process is exactly where most people get stuck.

Three things to have ready before you start

  • Your latest electricity bill (for the consumer number)
  • An Aadhaar-linked mobile number (for OTP)
  • A bank passbook or cancelled cheque in the connection holder's name
Sources: Revised Delhi Solar Policy announcement, 1 September 2026 — Chief Minister Rekha Gupta and Power Minister Ashish Sood (Hindustan Times report); Delhi Solar Portal (Delhi Solar Energy Policy 2023, notified 14 March 2024); PM Surya Ghar Muft Bijli Yojana. All figures are the Delhi Government's own published estimates and may change when the policy is revised.
Keep reading

More Delhi solar guides

Want your exact numbers?

Keep your electricity bill handy and call us — in five minutes we'll tell you your subsidy, what you'd pay and what you'd save.

Book a Free Rooftop Survey 📞 +91 96546 54369